Phase 3: Ground Anchor Construction Observation Report, September 26, 2014
- Main Body
- Tables
- Plates
- Drawings
- Appendix A - Plans and Specifications
- Appendix B - Field Activity Reports
- Appendix C - Responses to RFI's
- Appendix D - Letters
- Appendix E - Load Testing
- Appendix E - Important Information About Your Geotechnical/Environmental Report
Phase 3: Geotechnical Instrumentation Report, August 21, 2014
Phase 3: Data Report for Boring B-12, July 3, 2014
- Main Body
- Plates
- Appendix A - Field Activity Reports
- Appendix B - Subsurface Explorations
- Appendix C - Borehole Geophysic Surveys By Geovision, Inc.
- Appendix D - Instrumentation
- Appendix E - Important Information For Your Geotechnical/Environmental Report
Phase 3: Slope Stability Evaluation - Ground Anchor Construction Area, July 1, 2014
- Main Body
- Figures
- Appendix A - Field Activity Reports
- Appendix B - Test Pits
- Appendix C - Slope Stability Analyses
- Appendix D - Important Information About Your Geotechnical/Environmental Report
Phase 3: Ground Anchor Load testing Report, June 27, 2014
Phase 3: Ground Anchor Performance Testing Report, December 26, 2013
Phase 2: Geotechnical Construction Observation Report - Dewatering Drains, July 2, 2014
- Main Body
- Table
- Drawing
- Plates
- Appendix A - Field Activity Reports
- Appendix B - Wireline Profile Survey
- Appendix C - Contractor Submittals & Reponses
- Appendix D - Letters
- Appendix E - Meeting Minutes
- Appendix F - Notice of Non-Compliance
- Appendix G - Important Information About Your Geotechnical/Environmental Report
Phase 1: Construction As-Built Report for 11/1/12 Through 12/18/12 - Interim Grading, December 19, 2012
- Main Body
- Plate
- Figures
- Table
- Appendix A - Field Activitiy Reports
- Appendix B - Important Information About Your Geotechnical/Environmental Report
Phase 1: Geotechnical Design Report - Interim Grading Plan, October 9, 2012
Final Addendum Geotechnical Report No. 2 - Ground Anchor Design, April 17, 2013
- Main Body
- Tables
- Plates
- Figures
- Appendix A - Storm Drain Realignment Drawings
- Appendix B - Geotechnical Analysis and Design of Ground Anchors for Slope Stabilitization
- Appendix C - Dyna Force Elasto-Magnetic Sensor
- Appendix D - Important Information About Your Geotechnical Report
Final Addendum Geotechnical Report. No. 1, December 19, 2012
- Main Body
- Figure
- Plates
- Appendix A - Residential Structures Documents
- Appendix B - Field Activity Reports and Health and Safety Plan
- Appendix C - Subsurface Explorations
- Appendix D - Packer Testing
- Appendix E - Borehole Geophysical Surveys by Geovision, Inc.
- Appendix F - Instrumentation
- Appendix G - Geotechnical Laboratory Testing Procedures and Results
- Appendix H - Chemical Testing
- Appendix I - Stability Analyses
- Appendix J - Dewatering Analysis Results
- Appendix K - Important Information About Your Geotechnical Report
Final Geotechnical Engineering Report, August 15, 2012
- Executive Summary
- Main Body
- Figures
- Plates
- Appendix A - Subsurface Explorations
- Appendix B - Borehole Televiewer Surveys
- Appendix C - Instrumentation
- Appendix D - Geotechnical Laboratory Testing Procedures and Results
- Appendix E - Environmental Laboratory Testing
- Appendix F - Landslide Chronology and Features
- Appendix G - Stability Analysis
- Appendix H - Civil Feasibility Review Letter
- Appendix I - Important Information About Your Geotechnical/Environmental Report
Draft Preliminary Geotechnical Report
- Main Body
- Appendix A - Field Activity Reports
- Appendix B - Health and Safety Plan
- Appendix C - Draft Boring Logs
- Appendix D - Core Photos
- Appendix E - Acoustic and Optical Televiewer Logs
- Appendix F - Vibrating Wire Piezomenter Calibration Sheets
- Appendix G - Inclinometer Readings
- Appendix H - Environmental Sampling Test Results
- Appendix I - Important Information About Your Geotechnical-Environmental Report
- Figures