Skip to main content
Bureau of Engineering
About
About Us
2023 BOE BOOK
Organization
Rory M. Shaw Outstanding Employee Awards
Biodiversity Projects
2021-2023 Strategic Plan
History of City of Los Angeles City Engineers and Surveyors
Los Angeles' City Engineers & Surveyors
Divisions
Division Overview
Administration
Architectural
Bridge Improvement
Overview
710 Corridor Multi-Modal Improvements
Central District
Clean Water
2020 Floodplain Management Plan Update
Meeting Schedule
Overview
Public Outreach For 2020 FMP
Steering Committee
Meeting Agendas, Summaries and Handouts
News
Policies, Regulations, and Ordinances
Flood Info For Public
Floodplain Management Plan
Events Calendar
Meetings Schedule
Mission Statement, Goals, Objectives
Overview
Press Releases
Public Survey
Steering Committee Meeting Agendas, Summaries, and Handouts
Community Rating System
FMP Preparation Process
Public Outreach
Events Calendar
Flyers and Mailers
Overview
Public Survey
Steering Committee
National Flood Insurance Program Informational Video
About The Floodplain Management Plan (FMP)
Frequently Asked Questions
Overview
Policies, Regulations, and Ordinances
Terms and Definitions
FEMA Flood Protection Publications
Floodplain Management Plans, Newsletter and Reference Documents
Floodplain Mapping
Development In The Floodplain
External Links
LADWP Stormwater Capture Parks Program
Complete Streets
Construction Management
Environmental Engineering
Environmental Management
Overview
CEQA Process Overview
Archives
Sixth Street Viaduct Seismic Improvement (Archived)
Albion Dairy Demolition And Remediation & Albion Riverside Park Project (Archived)
Aliso Canyon Park Improvements Project (W.O. 1907295) (Archived)
Air Treatment Facility & Street Vacation at Mission Road & Jesse Street(Archived)
Baldwin Hills Communication Site Improvement Project (Archived)
Central Outfall Sewer at 59th Street and 4th Avenue Project (Archived)
Donald C. Tillman In-Plant Storage Basins (Archived)
Gaffey Street Pool and Bathhouse (Archived)
Hansen Dam Baseball Fields Renovation (Archived)
Hansen Dam Recreation Improvements (Archived)
Hansen Dam Phase II Ranger Station and Trail Improvement (Archived)
Hillcrest Drive Landslide Repair (Archived)
Mount Lee Communication Facility Site Improvements Project (Archived)
Mount Lukens Communication Tower Improvements Project (Archived)
Mount Lee Pipeline and Pumphouse (Archived)
New North East Area Police Station (Archived)
North Spring Street Viaduct Widening And Rehabilitation (Archived)
North Valley Fire Station No. 7 (W.O. E170093B) (Archived)
Olympic Boulevard And Mateo Street Improvements (W.O. E600077) (Archived)
Olympic West Pico East Initiative (Archived)
Police Academy Replacement Training Facility (Archived)
Runyon Canyon Park - Fuller Entrance Parking Area (Archived)
Smart Energy Transport System Recirculated Sections Of The Draft Environmental Impact Report (Archived)
Soto Street Widening - Multnomah Street To North Mission Road (Archived)
Street Vacation- Shatto Street between Witmer Street and Valencia Street (W.O. E1401160) (Archived)
Taylor Yard River Parcel G2 Project (Archived)
Temescal Canyon Park Stormwater Best Management Practices Project (BMP) – Phase II (Archived)
Vacation of 33rd Street between Figueroa Street and Flower Street Project (Archived)
Venice Beach Security Lighting (Archived)
Verdugo Peak Communications Tower Improvement Project (Archived)
Wilmington Drain Multi-Use And Machdo Lake Ecosystem Rehabilitation (Archived)
Geotechnical Engineering
Overview
Asilomar Blvd Street Stabilization Project
Pre-Design Report
Geotechnical Reports
Slide Presentations
White Point Landslide: Project Summary
Pre-Design Report
Geotechnical Reports
Status Reports
Timeline
Slide Presentations
Plans
Photos
Environmental Review Documents
Field Investigations
GIS and Mapping
LA River Projects
LAMP and Harbor District
Metro Transit
Permit Case Management
Project Award and Control
Real Estate
Recreation and Cultural Facilities
Overview
About Us
Specified Projects
Competitive Grants
Overview
10th Competitive Funding Cycle Letter
11th Competitive Funding Cycle - Reopened
11th Competitive Funding Cycle
Forms
10th Competitive Funding Cycle RFP
Competitive Grants Forms
Technical Assistance Seminar PowerPoint Presentation 2021
Technical Assistance Seminar Schedule
Health Alternatives to Smoking (HATS) Trust Fund
Standard Grant Agreement - Sample
10th Cycle 2020 Frequently Asked Questions
10th Cycle 2020 Frequently Asked Questions - 2
9th Cycle RFP Frequently Asked Questions
Local Volunteer Neighborhood Oversight Committees
Maintenance Funding
Parks First
Service and Maintenance Monitoring
Overview
Maintenance Quarterly Report Form
Service Quarterly Report Form
Status Reports
Picture Gallery
Contact Information
Sidewalk Repair Program
Street Improvement
Overview
Survey
Services
Employment
Structural Engineering
Systems
Valley District
Wastewater Conveyance Construction
Overview
Venice Dual Force Main Sewer
Notice of EIR Availability
Draft Environmental Impact Report
Final EIR
Projects in Environmental Review
Wastewater Conveyance Engineering
West LA District
For Employees
New! - Workday
eTime
Personal Portal
Video Remote Interpreting Service (VRI)
Public Records Request
Projects
Major Projects
Environmental Documents
Search For Projects
Bridging Los Angeles
Employee Resources
Office Locations
Newsletters
Standard Plans
Jobs
Translate
Search
Home
About Us
Divisions
Geotechnical Division
White Point Landslide: Project Summary
Plans
Plans
https://eng2.lacity.org/whitepoint/As-Bid%20Plans.pdf
Google Translate