Skip to main content

Wilmington Drain Multi-Use And Machdo Lake Ecosystem Rehabilitation (Archived)

The City is proposing to rehabilitate the Wilmington Drain and Machado Lake located adjacent to and within the Ken Malloy Harbor Regional Park (located at 25820 Vermont Avenue) in the communities of Wilmington and Harbor City, CD 15. The Machado Lake ecosystem, which includes Wilmington Drain, has been negatively impacted by trash, proliferation of invasive plant species, eutrophication, and sediment and nutrient accumulation, which has resulted in degraded water quality, fish and wildlife habitat, and hydraulic capacity. To address these problems, the City is proposing to implement a variety of measures designed to improve water quality; help meet adopted and future total maximum daily loads criteria; enhance riparian, wetland, and upland habitats; improve hydrologic and hydraulic conditions; and restore existing recreational amenities as well as develop new ones.

The City prepared a draft environmental impact report (EIR) to analyze the environmental impacts of the proposed project and alternatives and is requesting input from responsible agencies, trustee and other interested parties. The notice of availability and the draft EIR can be viewed from the links below and is available for review at Harbor City/Gateway Library, 24000 S. Western Avenue; Wilmington Branch Library, 1300 N. Avalon Boulevard; Harbor District Office No. 15 at 638 S. Beacon St., Suite 552, San Pedro; and the Bureau of Engineering, EMG at 1149 S. Broadway, 6th Floor, Contact: Maria Martin at (213) 485-5753, fax: (213) 847-0656.

The final EIR and project were considered by the Board of Public Works August 18, 2010, and the Energy and Environment Council Committee September 21, 2010. The final EIR and project were certified and approved, respectively, by City Council and a notice of determination was filed on September 28, 2010.

Wilmington-Harbor City Community Plan. Council District 15. If you have any questions please contact Maria Martin at (213) 485-5753 or Maria.Martin@lacity.org.

Report
(Click on italicized text to view report)
Review Status Public Review Period
Initial Study Closed August 27, 2009 – September 25, 2009
Notice of Preparation    
Notice of Availability of DEIR    
DEIR Closed March 18, 2010 – May 03, 2010
Final EIR    
DEIR Appendices    
Notice of Determination