Skip to main content

Donald C. Tillman Water Reclamation Plant Personnel And Multi-Use Facility Project

An Initial Study/Mitigated Negative Declaration (IS/MND) is available for review for the Donald C. Tillman Water Reclamation Plant (Tillman) Personnel and Multi-Use Facility project. The proposed project involves the replacement of an existing 1,250 square foot temporary trailer structure used by Donald C. Tillman Water Reclamation Plant Japanese Garden staff, docents and gift shop with a permanent 17,892 square-foot personnel and multi-use facility building. The building would house the existing employees, docents and the gift shop as well as include meeting and conference rooms and exhibit space. Exhibits currently housed within the Administration Building would be relocated to the new Personnel and Multi-Use Facility building. Following completion of construction the remaining undeveloped portion of the parking lot would be reconfigured to accommodate approximately 113 vehicles. Although the proposed project could result in a significant effect on biological resources, there would not be a significant effect as a result of implementation of the identified mitigation measure.

The Initial Study/Mitigated Negative Declaration can be viewed from the links below and is available for review beginning April 19, 2012 at the following locations:

  • Van Nuys Branch Library, 6250 Sylmar Avenue, Van Nuys
  • Council District 6 Van Nuys City Hall Office, 14410 Sylvan Street, Suite 215, Van Nuys
  • Public Works, Bureau of Engineering, EMG, 1149 S. Broadway (contact Nicole Cobleigh at 213-485-5761)

Comments must be received in writing by May 8, 2012, by e-mail to Nicole.Cobleigh@lacity.org (include "Tillman Personnel & Multi-Use Facility Project" in subject), or mail to:

Nicole Cobleigh 
City of Los Angeles
BOE EMG
1149 South Broadway, Suite 600, Mail Stop 939
Los Angeles, CA 90015

If you have any questions, please contact Nicole Cobleigh at (213) 485-5761 or via e-mail at Nicole.Cobleigh@lacity.org

Report
(Click on italicized text to view report)
Review Status Public Review Period
Notice of Intent to Adopt MND    
Initial Study/Mitigated Negative Declaration Closed April 19, 2012 - May 8, 2012

Initial Study Appendices